Second Shore

Aerial view of Segment

 clay 1 single 0006

  • 82’ long x 12’ wide
  • Environmentally friendly
  • Solar-powered, self-contained and self-sustainable
  • Useable year-round
  • Moveable and adaptable – usage programming evolves throughout the day and week
  • Manufactured at the Port of Chicago – 10th Ward
  • All-in segment cost: $150-200k
  • All-in cost / mile (ave.): $10MM
  • Project cost: $84MM for 6.5 miles
  • Cost comparisons:
    - The 606: $95MM, 2.7 miles; $35MM/mile
    - River Walk: $100MM; 0.51 miles; $196MM/mile

clay 1 single 0005